Hype Ltd produces four types of clothes with the use of a special machine. Each labor hour in the special machine costs £10. For the production of the four products the company has 6,800 special machine labor hours. There will be no shortage of any other factor of production. Costings and break-even quantities for the products are as follows:

Products A (Jeans) B (Shirts) C (Jackets) D (Coats)
Material cost per unit £20 £30 £60 £100
Special machine labor hours per unit 0.25 0.5 0.4 0.55
Fixed costs £40,000 £50,000 £70,000 £120,000
BEP (break-even point) quantity 1,000 1,500 1,400 2,100
For each type of product the management of the firm aims at the following targeted profit levels:
Product Target Profit
A £100,000
B £120,000
C £150,000
D £200,000
However, the marketing department has conducted a consumer survey and estimated that the actual demand for the products will be different from that corresponding to the targeted profits. The estimated quantity demanded for each product is given in the table below:

Product Estimated Quantity Demanded
A 3,200
B 3,600
C 4,300
D 5,300
REQUIRED:
1. Calculate the volume of activity that the company will have to achieve in order to meet the targeted level of profit for each one of the four products.
2. Calculate the optimal production each of for the four products by taking into account the available labor hours and the estimates of the marketing department.
3. Propose ways that could help the company to solve the problem of special machine time shortage (around 300 words).

For getting the instant digital download answer, Please click on the “PURCHASE” link below to get Hype Ltd produces four types of clothes with the use of a special machine Answer

For instant digital download of the above solution or tutorial, please click on the below link and make an instant purchase. You will be guided to the PAYPAL Standard payment page wherein you can pay and you will receive an email immediately with a download link. Please note that in case of technical glitch, the solutions will be emailed to you within 24 hours.

In case you find any problem in getting the download link or downloading the tutorial, please send us an email on mail@edusolutionguide.com